Identify potential safety hazards and the proper personal protective equipment for working on grid-direct PV systems (OSHA).
Install photovoltaic PV systems in accordance with applicable codes and standards based on given instruction.
2nd Quarter Defining Features
Define equipment grounding, system grounding, and components and conductors used for grounding.
List the pros and cons of different mounting systems. (ground, pole, roof, and trackers) and determine the number of modules that can fit in a given roof space.
Diagram and list the features, applications, and components of the following PV system types: DC direct, stand-alone, grid-direct, and grid-tied with battery back-up.
3rd Quarter OJL Calculations
Perform power and energy calculations.
Identify the following wires and components on schematics of residential grid-direct systems: disconnects, inverter, equipment grounding conductors, ungrounded conductors, grounded conductors, the grounding electrode(s), and the AC and DC system grounds.
4th Quarter OJL Performance
List the order of installation, commissioning, and decommissioning of a grid-direct PV system.
Obtain and apply specifications for PV modules and determine their performance given various environmental and operating conditions.
5th Quarter Diagram
Diagram and determine the power, current, and voltage characteristics of PV modules in different series and parallel configurations.
Review of OSHA Guidelines grid-direct PV systems.
6th Quarter OJL Evaluate
Estimate energy production of a PV system based on location specifics including orientation and tilt angle.
Given specific site criteria, evaluate what type of inverter is appropriate.
Bolting of structural framing and solar modules.
7th Quarter OJL Design
Decipher balance-of-system equipment specification sheets to determine the critical information needed for system design.
Design a residential grid-direct system including the array, inverter, circuit conductors, and overcurrent protection.
Applying weather sealing to building or support mechanisms.
Understanding current requirements for the photovoltaic installations.
Examine designs and electrical configurations.
8th Quarter OJL Install
Assembly of solar modules and its support structures on the ground and roof.